(408) 374-0900

slideshow

Visit Our Showrooms

Bay
122 Orchard City Drive
Campbell, CA 95008

(408) 374-0900
Mon - Fri 10 - 5
Sat 11 - 2

Beach
3045 Porter Street
Soquel, CA 95073

(831) 477-9800
Open by appointment

License #575006 

Remodeling and Home Design

Monthly Newsletter

Resources, events and news about Design/Build news, Tips for making your Home a "Healthy Home", Multi-Generational Families, Aging In Place and more.  To receive our Newsletter:
Sign Up Now
Home arrow The Gridley Difference arrow Our Special Proccess
Our Special Process PDF Print E-mail

The Gridley Perfect Project Process

We are committed to delivering consistently beautiful results and a positive experience to every one of our clients. In order to achieve our goal, we have developed the Gridley Perfect Project Process. From a bath to a whole house remodel, every Gridley Company project receives the same high level of care and attention to detail.

Here are the 25 steps most projects follow when you work with us:

  1. Initial free consultation and initial project discussion.

  2. Design agreement executed. Target budget for entire project, design and construction discussed.

  3. Initial project schedule established.

  4. Pre-design designer/homeowner meeting.

  5. Site visit for measuring floor plan.

  6. Review design options and relative cost implications.

  7. Materials and products selected to allow more accurate estimation of construction costs for design selected. Products and materials ordered ahead of time are stored in our climate-controlled warehouse until needed.

  8. Construction estimates prepared, with homeowner selections included. Resulting estimate discussed.

  9. If estimate is on track and approved, continue. If changes are required, they are made and reviewed for approval. Homeowner may elect to use allowances in lieu of making final product or material decisions.

  10. Availability and delivery times of any special materials or products checked.

  11. Construction contract prepared and executed.

  12. Detailed construction drawings, specifications and documentation prepared.

  13. Permits and approvals obtained.

  14. Products and materials ordered.

  15. Construction schedule finalized.

  16. Homeowner/project manager have pre-construction meeting.

  17. Prepare homeowner and home for project.

  18. Construction phase starts. Homeowner has daily and weekly communication with site staff and project manager about schedule and sequence of events.

  19. Site prep; demolition if needed; foundations and framing; plumbing and electrical; inspections; insulation; closing up walls (exterior and interior); installation of cabinets, fixtures, appliances, trim, counters and flooring; painting; and other finishing work and inspections.

  20. Substantial completion and punch list preparation inspection.

  21. Punch list services provided, with homeowner approving items as signed off.

  22. Final homeowner and project manager inspection.

  23. Project complete.

  24. Twelve to 24 months after completion, project manager walks through project with homeowner to determine if any warranty work is needed.

  25. You are so happy with your project you tell all your friends.


 

 

The Gridley Difference

The Gridley Difference Watch the video

Helpful Tips

Design/Build Method Advantages 

The design/build method offers homeowners many advantages for most remodeling projects.

Read more...
 

Testimonials

"We just wanted to write to you and let you know how pleased we are with our new Gridley Kitchen. When we started this project we were a bit apprehensive, given that we had such a small space to work with and how something would blend into our 50 year old home. The results were unbelievable. We now have a modern, efficient, beautiful kitchen that fits perfectly."

-S. & J. Holcomb

 
San Jose Design Build Contractor | Green Remodeling Company | Home Renovation and Remodeling Services | Interior Home Remodeling | Contact Us

© The Gridley Company, Inc. 122 Orchard City Drive, Campbell, CA 95008 - (408) 374-0900 and 3045 Porter Street, Soquel, CA 95073 - (831) 477-9800

The Gridley Company is one of the premier design/build remodeling contractors in the San Jose Bay Area servicing Santa Cruz, Campbell, Los Gatos, and
Mountain View, providing award winning kitchen design and renovation, bathroom design and renovation, and room additions.

Site Map | Privacy Policy